top of page
IMG_0053_edited.jpg

Richard Bronson

We redesigned the master bathroom by gutting the shower and tub area. 

​

Keeping the vanity and toilet room where they were but giving those areas an uplift as well.

 

In the vanity area:

  • We added LED lighting to the bottom of the vanity and by the mirrors. 

  • We replaced the sinks and faucets. The faucets are wall mounted and cut through the mirrors, which was a challenge. 

  • We replaced the mirrors and added tile in between the mirrors.

  • We replaced the vents for Fittes vents for a contemporary seamless look. 

 

In the shower & tub area:

  • We added a new free-standing tub with an accent piece for the faucets to attach to. 

  • We installed large format tile (24x48) to the floors and walls to avoid as many grout lines as possible.

  • Added an L-shaped wall to allow for plumbing and lighting in the shower without needing a shower door.

  • A linear drain was added to the back wall to avoid having to look at a drain in the middle of this beautiful floor. 

 

Toilet room:

  • Replaced toilet with a bidet toilet.

  • Tile floor

  • Fittes exhaust fan cover for a contemporary look and added LED lights inside for additional light.

 

Master closet and bedroom:

  • New carpet and paint

 

Full main level:

  • New large format tile with Fittes vents throughout the walls and floors. 

  • New pattern carpe on the stairs.

  • New Paint 

  • New light fixtures

  • Re-designed entertainment area to be more contemporary and clean to fit a larger TV

bottom of page